WAAD AL-SHAMAL INTEGRATED SOLAR COMBINED CYCLE POWER PLANT (WAS ISCCPP) Mar 2017
  • Location : Turaif.
  • Main Contractor: ABENER.
  • CLIENT: GE/SAUDI ELECTRICITY COMPANY
  • Task: Pipe line will be used to supply Natural Gas from Saudi Aramco Pipe Line Facilities

  • General Scope:
  • Construction of 44" Natural Gas Pipe Line for 15.75KM
  • Civil /Mechanical/Piping ) Construction, Testing, Commissioning
  • Associated Electrical /Instrumentation and Communication
  • Engineering Procurement Construction Work
    • Cathodic Protection
    • Leak Detection system
    • Power supply
    • Scraper Trap facilities

     

 
GAS COMPRESSION FACILITIES AT PS-3 STABILIZER. May 2017
  • Location : Pump Station #3
  • Main Contractor: Saudi Aramco
  • Task: To provide Facilities to increase the compression and NGL processing facilities in order to restore the original oil and shipping capacity at PS-3 to 175 MBCD ASL with all associated gas/NGL recovered without flaring

  • General Scope:
  • Detailed Engineering and design
  • Procurement and material management
  • Fabrication, transportation, Erection and construction activities through mechanical completion
  • Pre-commissioning and commissioning of new Compression Train.

 

 
SA ONSHORE MAINTAIN POTENTIAL PROJECTS ZONE SA-1, ZONE SA-2, ZONE SA-4 May 2017
  • Location : Southern Area Zone
  • Main Contractor: Saudi Aramco
  • Task: Perform the Construction and installation of all phases of well sites (GAS, OIL, WATER)

  • General Scope:
  • Mechanical
  • Piping and Civil /Structural/Coating /Fencing
  • Electrical and instrumentation works to connect the flow line
  • Develop the well sites with safety security and maintain asset integrity